24/7
Continuous monitoring of selected rail-side locations
RailGuard Construction Zone Monitoring
RailGuard helps rail operators and contractors monitor temperature, tilt, cant, weather and track-side condition changes around construction zones, temporary works and high-risk rail-side activity.

Construction site overview
See the monitored construction site, RailGuard device positions, site status, limits and track map in one operational view.
RailGuard
Track-side construction can change the risk picture quickly. Excavation, piling, heavy plant, temporary works, drainage changes and nearby civil activity can all create conditions that deserve faster visibility than manual inspections alone can provide.
24/7
Continuous monitoring of selected rail-side locations
CRT
Rail temperature and critical temperature risk context
Geo
Tilt, cant and track-side geometry indicators
1 flow
Alert, inspection, report and cost history in Sepolo
Monitor tilt, cant and residual changes that may indicate movement near a work zone.
Combine local weather, rail temperature and forecast data when heat or changing conditions may affect rail behaviour.
Build a timeline of readings before, during and after construction activity so engineers can see what changed and when.
Use watch and alert states to decide which locations need field verification first.
Give operators, contractors and engineering teams a shared record of measurements, alerts, actions and outcomes.
Convert alerts into Sepolo inspections, assign engineers, record findings and connect cost to the monitored location.
RailGuard
The same RailGuard views used for rail infrastructure monitoring can support temporary construction zones where changing ground, heat, vibration or nearby works may require faster operational follow-up.

See the monitored construction site, RailGuard device positions, site status, limits and track map in one operational view.

Compare latest, yesterday and previous measurements across RailGuard control points to see whether movement is developing.

Export evidence showing baseline, latest measurement, samples and movement values for each monitored RailGuard point.
Select the rail-side locations, thresholds, reporting rules and stakeholders before the POC starts.
Place RailGuard at relevant points around the construction area and validate readings with the local rail team.
Track rail temperature, weather, tilt, cant and other agreed indicators while work is active.
When a location enters watch or alert state, Sepolo can create follow-up work and route it to the right team.
Readings, inspections, reports, photos, cost and close-out notes stay connected to the construction zone history.
RailGuard